Sunday, December 25, 2011

Wild West Cabin Remodeled By TF Tiling and Remodeling Completed

                   Bathroom 1   001 (1)  bedroom a 1 bedroom e 3 

bedroom a 2 001 (3)1 

bedroom a 3 bedroom e 4

    Bedroom Master A 1 001 (9)

I didn’t get a photo of the Master Bedroom before we piled it full of all the other stuff from the other rooms. We Scraped the popcorn plaster off the ceiling and painted the ceiling. Tore out the old carpeting and put in the new floor and of course put up the doors on the closets.

Bedroom Master A 2 001 (11)

The Same with the photo of the living room, we had already emptied most of it into the bedroom before I took any photos.

     Living Room A   01 001 (8) 

     Kitchen A 1 001 (16)

 Kitchen A 2 001 (6)

               View Photo Album Here: Wild West 1' target=_blank>Photo Album of Remodeling Project of Wild West

No comments:

Post a Comment


Adventures of Shadow the RVing Dog.




Copyright Protected

Archives

        
OLDEST POSTINGS: 03/07/2010  TO  03/02/2011